CGH Pacífico Mascarenhas

Power: 2,944 MW
Location: Santana do Riacho - MG
CEI Start-up: 2017
A CGH Pacífico Mascarenhas entrou em operação no ano de 1928, encontra-se instalada no Rio Parauninha, Bacia do São Francisco e possui três turbinas Pelton.

ITUERÊ

Power: 4,04 MW
Location: Rio Pomba – Minas Gerais
CEI Start-up: 2018
A CGH Ituerê entrou em operação no ano de 1928, encontra-se instalada no Rio Pomba, bacia Atlântico Leste, possui uma turbina Francis Horizontal rotor duplo e 01 turbina Francis Horizontal com dois rotores.

COSTA RICA

Power: 16 MW
Location: Costa Rica – Mato Grosso do Sul
CEI Start-up: 2018
A PCH Costa Rica entrou em operação no ano de 1999, encontra-se instalada no Rio Sucuriú, bacia do Rio Paraná, possui três turbinas do tipo Francis Horizontal.

CGH NOVA PONTE QUEIMADA II

Power: 3,0 MW
Location: Rio Casca – Minas Gerais
CEI Start-up: janeiro/2019
A CGH Nova Ponte Queimada II entrou em operação no ano de 2019, encontra-se instalada no Rio Casca, bacia do Rio Doce, possui duas turbinas do tipo Kaplan S.

PCH CABOCLO

Power: 4,42 MW
Location: Ouro Preto
CEI Start-up: 2015
PCH Caboclo started operation in 1944, is installed on the Rio Mainart, Rio Doce basin, working with two Francis turbines.

PCH SALTO

Power: 4,505 MW
Location: Ouro Preto
CEI Start-up: 2015
PCH Salto started operation in 1940, is installed on the Rio Mainart, Rio Doce basin, working with two Francis turbines.

PCH FUNIL

Power: 4,23 MW
Location: Ouro Preto
CEI Start-up: 2015
PCH Funil started operation in 1949, is installed on the Rio Mainart, Rio Doce basin, working with two Francis turbines.

PCH CACHOEIRA DOS PRAZERES

Power: 3,7575 MW
Location: Ouro Preto
CEI Start-up: 2015
PCH Cachoeira dos Prazeres started operation in 1951, is installed on the Rio Prazeres, Rio Doce basin, working with two Pelton turbines.

PCH FUMAÇA

Power: 10.0 MW
Location: Mariana/Diogo de Vasconcelos
CEI Start-up: 2003
PCH Fumaça started operation in 2000, is installed on the Rio Gualaxo do Sul, Rio Doce basin, working with two Francis turbines.

PCH FURQUIM

Power: 6.0 MW
Location: Mariana
CEI Start-up: 2015
PCH Furquim started operation in 2003, is installed on the Rio Carmo, Rio Doce basin, working with two Francis turbines.

PCH CONGONHAL I

Power: 1,816 MW
Location: Baepaendi - MG
CEI Start-up: 2012
PCH Congonhal I started operation in 1927, is installed on the Rio Jacu, basin of Rio Grande, working with three Francis turbines.

CGH CONGONHAL II

Power: 0,428 MW
Location: Baepaendi - MG
CEI Start-up: 2012
CGH Congonhal II started operation in 1970, is installed on the Rio Jacu, basin of Rio Grande, working with two Francis turbines.

CGH HENRIQUE PORTUGAL

Power: 0.80 MW
Location: Santa Rita do Jacutinga - MG
CEI Start-up: 2012
CGH Henrique Portugal started operation in 1953, is installed on the Rio Bananal, basin of the Paraíba do Sul River, working with two Francis turbines.

PCH PAES LEME

Power: 1.92 MW
Location: Passa Vinte - MG
CEI Start-up: 08/2012
PCH Paes Leme started operation in 1927, is installed on the Rio Bananal, basin of the Paraiba do Sul river, working with three Pelton turbines.

CGH PIRAMBEIRA

Power: 0,528 MW
Location: Baependi - MG
CEI Start-up: 2012
CGH Pirambeira started operation in 1927, is installed on the Rio das Furnas, basin of Rio Grande, working with two Francis turbines.

CGH RIBEIRÃO

Power: 0.18 MW
Location: Baependi - MG
CEI Start-up: 2012
CGH Ribeirão started operation in 1911, is installed on the Rio das Furnas, basin of the Rio Grande, working with two Francis turbines. Listed as a historic building by the Municipality of Baependi, CGH Ribeirão is special because it is one of the oldest hydropower plants in the State of Minas Gerais.

CGH BRITO

Power: 2.90 MW
Location: Ponte Nova - MG
CEI Start-up: 2016
CGH Brito started operation in 1924, is installed on the Rio Piranga, Rio Doce basin, working with 01 Francis turbine and one screw turbine.